Metals Acquisition Limited Announces June 2024 Quarterly Report

Record Quarterly Production and Cash Flow Generation1




ST. HELIER, Jersey–(BUSINESS WIRE)–Metals Acquisition Limited (NYSE: MTAL; ASX:MAC)

Metals Acquisition Limited ARBN 671 963 198 (NYSE: MTAL; ASX: MAC), a private limited company incorporated under the laws of Jersey, Channel Islands (“MAC” or the “Company”) is pleased to release its June 2024 quarterly activities report (“Q2 2024” or “June quarter”).

HIGHLIGHTS

TRIFR of 14.4 an increase quarter on quarter with remediation strategies implemented, zero recordable injuries in the month of June.

Record quarterly copper production under MAC ownership

  • Record copper production under MAC of 10,864 tonnes up ~24% quarter on quarter, with record copper production month in June of 5,378 tonnes
  • Record daily production under MAC of 265 tonnes – highest daily production since 2021
  • The record quarter achieved despite a major planned maintenance shutdown in April, with 1,583 tonnes produced for the month, and a combined 9,281 tonnes of copper produced over May and June
  • Copper grade of 4.2% for the quarter, a ~20% increase from the prior quarter as the mine plan shifted to higher grade stopes and dilution control was improved
  • C1 of US$1.92/lb2 and Total Cash Costs of US$2.62/lb3 improved by ~11% and ~17% respectively compared to the March quarter, driven by improved production resulting from grade, operational efficiencies and consistency improvements
  • Copper production for 2024 tracking to mid-point of guidance with no change to 2025 and 2026 guidance

Generating material free cash flow

  • Operational free cash flow of ~US$21 million4 for the quarter with an average realised Copper sales price of US$4.41/lb5 (Q2 Copper spot average at US$4.42/lb)
  • Cash and cash equivalents increased by ~25% to US$88.6 million after pre-sales of US$37.4 million, payment of a one-off Stamp Duty payment of US$23.2 million, repayment of US$7.9 million in senior debt principal, a ~US$1.8 million investment in Polymetals Limited (“POL”) and US$2.1 million of exploration expenditure
  • MAC also has US$2.8 million of outstanding Quotational Period receipts and US$20.7 million of unsold concentrate as at 30 June 20246, with the June quarter resulting in a strong build in cash and available liquidity
  • Generated unaudited preliminary revenue of ~US$78 million (excluding pre-sales of US$37.4 million), an increase of 18% quarter on quarter

Strategic investment and simplification of capital structure

  • MAC made a strategic investment in POL with an initial A$2.5m invested for a 4.31% interest in POL, which also provides for access to water rights and Zinc processing capacity
  • Simplification of the capital structure with the completion of the Private and Public warrant redemption process as announced on 10 June 2024

Production and cost summary

Table 1 – Production and cost summary (unaudited)

Units

Q4 2023

Q1 2024

Q2 2024

QoQ Change (%)

H1 2024

Copper Production

Tonnes

9,832

8,786

10,864

23.7%

19,650

Sustaining capital

US$ million

$10.0

$13.0

$12.8

(0.2%)

$25.8

Cash cost (C1)7

US$/lb

$1.99

$2.15

$1.92

(11%)

$2.02

Total cash cost8

US$/lb

$2.73

$3.17

$2.62

(17%)

$2.86

Group Net Debt9

US$ million

$260

$253

$231

(9%)

$231

Metals Acquisition Limited’s CEO, Mick McMullen, said:

“Our operations performed to a record level under MAC’s ownership and in line with our mine plan during the June quarter, reaching a record level of production of 10,864 tonnes of copper with around 89% of that production being produced over the last two months of the quarter. This record production was achieved even with a major planned maintenance shutdown in April.

The production trend in the quarter was for sequentially stronger production each month coming out of the planned mill shutdown in April. Higher grade stopes at the CSA Copper Mine form a large proportion of our annual production and played a key role during the quarter, with milled copper grade improving by around 20% to 4.2% compared to the previous quarter.

Our CSA Copper Mine operational team delivered as per the new 2023 mine plan, and as the quarter progressed went from strength to strength in delivering consistent production whilst significantly improving safety performance. Overall, our TRIFR remains above where we would like it but the site team had zero recordable injuries in the month of June, coupled with record production and cost performance.

We again ended the quarter with a large broken ore stockpile of high-grade ore which will underpin production over the upcoming quarter. Based on the reserve plan, we expect copper production to now stabilise over the remaining quarters of the year.

The further benefit of the record production is the fact that our unaudited preliminary revenue (excluding the US$37 million of concentrate pre sales) increased by 18% to US$78 million compared to the previous quarter, with the increased production also contributing to the reduction in our C1 by around 11% to US$1.92 per pound. This also boosted our cash and cash equivalents by some 25% to US$88.6 million for the quarter after settling a one-off Stamp Duty payment of around US$23.2 million and further reducing our interest bearing liabilities by another US$7.9 million.

This is an incredibly strong result when considered in the context of the bulk of the production and cash flow coming from the last two months of the quarter alone.

We have already put the additional liquidity to good use in reducing our overall interest-bearing liabilities by approximately US$140 million since the start of 2024, which further support simplifying and building a strong balance sheet.

As part of the ongoing turnaround and optimisation at the CSA Copper Mine, we announced in Q2 2024 the new Reserve and Resource Statement, which is a snapshot in time based on information available back in August 2023. As reported earlier in the quarter, the new 2023 Reserves and Resources Statement shows a substantial increase of 64% in contained copper after replacement of depletion to 0.5Mt in Ore Reserves at an average grade of 3.3% Cu, and an impressive 42% increase in total contained Cu after replacement of depletion to 0.7Mt in total Mineral Resources at an average grade of 4.9% Cu, respectively, compared to the 2022 Reserve and Resource Statement.

The operational performance and the resource upgrade support our belief that the CSA Copper Mine is a high-quality, free cash flow generating, long life copper asset. The performance of the site team in the June quarter has showcased just what this mine can do when operations perform the way we know it can, and the Board and I would like to express our thanks to the entire team for the strong performance.

Finally, to reconfirm our disciplined M&A strategy, we will continue to evaluate prospects for growth to enhance shareholder value.”

ESG

Safety

The TRIFR for the CSA Copper Mine increased from an average of 11.9 in Q1 2024 to 14.4 in Q2 2024. This is below the NSW underground metalliferous TRIFR average for 2022 of 15.5. Q2 2024 has not been favourable for safety performance with two contractor LTI’s, three MTI’s and one RWI recorded for the period. June improved with no recordable injuries, showing a strong improvement from prior months. Plans are in place to implement strategies to remediate the increase in TRIFR through increased awareness via extensive training and coaching, as well as increased safety presence on site.

Figure 1 – CSA Copper Mine Recordable Injuries by Quarter

Regulatory

The CSA Mine Rehabilitation Objectives Statement, Final Landform and Rehabilitation Plan, the Annual Rehabilitation Report and the CSA Mine Forward Program have all been approved by the NSW Resources Regulator. Scoping is currently underway for alternate energy providers for a mix of both wind and solar, to potentially secure long term energy security, pricing and reductions in greenhouse gas emissions.

The STSF Stage 9 buttress bulk earthworks are now complete. Geochemical testing is being completed for Stage 10 material, with the tendering process under way.

Operations

Table 2 – Quarterly Operational Performance of the CSA Copper Mine (unaudited)

CSA Copper Mine Metrics (unaudited)

Units

Q4 2023

Q1 2024

Q2 2024

QoQ % variance

H1 2024

U/g development – Capital

Metres

841

466

449

(4%)

915

U/g development – Operating

Metres

448

703

611

(13%)

1,313

Rehab

Metres

153

246

113

(54%)

360

Total development

Metres

1,441

1,415

1,173

(17%)

2,588

Ore Mined

Tonnes

268,685

256,031

271,469

6%

527,500

Tonnes Milled

Tonnes

266,105

260,297

266,936

3%

527,233

Copper grade milled

%

3.8%

3.5%

4.2%

20%

3.8%

Copper Recovery

%

97.6%

97.6%

97.3%

0%

97.4%

Copper Produced

Tonnes

9,832

8,786

10,864

24%

19,650

Silver Produced

Ounces

114,969

102,182

134,701

32%

236,883

Copper Sold

Tonnes

10,812

8,039

8,048

0%

16,087

Achieved Copper price10

US$/lb

3.85

3.87

4.41

14%

4.14

Mining Cost

US$/t Mined

$75.5

$95.7

$91.9

(4%)

$93.7

Processing Cost

US$/t Milled

$25.5

$25.7

$31.9

24%

$28.8

G+A Cost

US$/t Milled

$29.6

$33.1

$25.6

(23%)

$29.3

Total Operating Cost

US$/t

$130.6

$154.6

$149.3

(3%)

$151.9

Development Cost

US$/metre

$9,667

$15,478

$9,330

(40%)

$12,404

Sustaining Capital11

US$ million

$10.0

$13.0

$12.8

(2%)

$25.8

Tonnes Milled per employee

t/employee

189

184

186

1%

185

Mining

US$/lb prod

0.94

1.27

1.04

(18%)

1.14

Processing

US$/lb prod

0.31

0.35

0.36

3%

0.35

General and Admin

US$/lb prod

0.36

0.44

0.28

(36%)

0.36

Treatment and refining

US$/lb prod

0.36

0.17

0.17

0%

0.17

Work in Progress inventory

US$/lb prod

(0.01)

(0.14)

0.03

(121%)

(0.04)

Freight and other costs

US$/lb prod

0.17

0.17

0.14

(18%)

0.15

Silver Credits

US$/lb prod

(0.14)

(0.10)

(0.11)

10%

(0.11)

C1 Cash Cost

US$/lb prod

1.99

2.15

1.92

(11%)

2.02

Leases

US$/lb prod

0.07

0.08

0.07

(13%)

0.07

Inventory WIP

US$/lb prod

0.01

0.14

(0.03)

(121%)

0.04

Royalties

US$/lb prod

0.20

0.13

0.13

0%

0.13

Sustaining capital

US$/lb prod

0.46

0.67

0.53

(21%)

0.59

Total Cash Cost

US$/lb prod

2.73

3.17

2.62

(17%)

2.86

Total Revenue

US$ millions

88.3

66.0

78.0

18%

144.1

Unless stated otherwise all references to dollar or $ are in USD.

The June quarter was affected by a planned major shut of mill operations in April 2024, which was offset by a ramp up in production over May and June resulting in comparable tonnes milled from Q4 2023 to Q2 2024. Production further benefited from an increased grade of 4.2%. Mining methods have been refined during the quarter with blasting techniques reviewed and updated resulting in lower dilution.

Double lift extraction sequence was completed on two stopes in Q2 that performed better than expected, resulting in less mining dilution achieved with stronger grades and less total ore tonnes for the same metal. This has been critical to the H1 strategy and will be implemented across future stopes in Q3. Ventilation system upgrades continued to be scoped in Q3 to access future stopes. Increased paste was placed in June meaning the mine is well placed for production into July.

Figure 2 – CSA Copper Mine Quarterly Copper Production (tonnes)

The average received copper price before hedge settlements was higher when comparing to the prior period with the June quarter at US$4.41/lb, up ~14% compared to US$3.87/lb for the March quarter, with the average spot copper price over the June quarter at ~US$4.42/lb.

In addition, the Australian dollar exchange rate was broadly flat compared to the prior quarter.

C1 cash costs decreased by ~11% quarter on quarter from US$2.15/lb in the March quarter to US$1.92/lb for the June quarter. The higher production tonnes, as detailed above, resulted in an impact to C1 costs of approximately US$0.40/lb, whilst the overall cost variance was approximately US$0.16/lb.

This is an incredibly strong result given the low production in April due to the planned mill shutdown with C1 for May and June during normal operations at US$1.52/lb.12

Figure 3 – CSA Copper Mine C1 Cash Costs13 – US$/lb produced

MAC management will continue to implement additional productivity measures to further reduce C1 costs.

Figure 4 provides an illustration of tonnes milled per employee, which remains relatively stable quarter on quarter despite the shut in April 2024.

Figure 4 – CSA Mine Tonnes Milled per Employee

Figure 5 – CSA Mine Mining Unit Rate US$/t

Apart from copper production, the largest driver of C1 costs is the mining unit rate as mining accounts for approximately 60% of total site operating costs.

Mining unit rates were broadly in line with the prior quarter with similar capital development metres achieved. Lower capital development performance in Q1 and Q2 resulted in a lower portion of costs able to be capitalised in those quarters, and hence contributed to the increase in the mining costs when compared to Q3 and Q4 2023.

Figure 6 – CSA Copper Mine Mining Development Costs

Figure 7 – CSA Copper Capital Development metres

Figures 8 and 9 shows the unit rates for processing and site G&A for the year.

Processing costs per tonne milled increased in the June quarter given the 10-day full plant shutdown in April. Work was completed on schedule and budget with no significant incidents recorded.

G&A unit rates decreased during the current quarter after reallocation of stock consumables to mining and processing previously allocated to G&A.

Figure 8 – CSA Copper Mine Processing Unit Rate US$/t

Figure 9 – CSA Copper Mine Site G+A Unit Rate US$/t

As seen in Figure 10, capital spend (including capitalized development) decreased slightly over the quarter, largely driven by work on the TSF embankment, diamond drilling and plant related works as part of the mill shutdown, with the latter adding an additional US$1.4 million in costs for the quarter.

Figure 10 – CSA Copper Mine Sustaining Capital Expenditure

Rail delays due to coal protest action in the NSW Hunter Valley meant that ~24kt of copper concentrate remained at site and at port at quarter end, of which ~18kt of concentrate was pre-sold during the quarter.

Cash position, liquidity and debt facilities

The Company’s unaudited cash holding at the end of Q2 2024 was ~US$88.6 million for an unaudited net debt14 position of ~US$231 million.

The unaudited cash position is after taking into account the one-off payment of Stamp Duty to the New South Wales government on the purchase of the CSA Copper Mine amounting to ~US$23.2 million. A further ~US$7.9 million was also repaid on the Senior Debt Facility at the end of the quarter.

As of 30 June 2024, the Company had ~US$115 million of liquidity with access to a US$25 million revolving facility and, as at the date of this release, has around ~US$2.8 million of outstanding Quotational Period receipts and around~US$20.7 million of unsold concentrate as at the 30 June 2024 spot copper price15.

Figure 11 – Q2 2024 Cash flow waterfall (US$M)

Mine Plan, Resource and Reserve

As previously reported, on 23 April 2024 we announced the release of the new 2023 Reserves and Resources Statement (“R+R”). The effective date for the R+R was 31 August 2023 and as such, any new information received after that time has not been incorporated into the R+R at this stage.

Acquisition of additional 10% of the joint venture interests in the Shuttleton and Mt Hope Exploration Licence tenements

At the time MAC acquired CMPL from Glencore in 2023, CMPL held an interest (90%) in two tenements (EL6223 and EL6907) in joint venture with AuriCula Mines Pty Limited (“AuriCula”), a wholly owned subsidiary of International Base Metals Limited. The Shuttleton Joint Venture between CMPL (90%) and AuriCula (10%) covered EL6223, which is located approximately 75km south of Cobar.

The Mt Hope Joint Venture CMPL (90%) and AuriCula (10%) covered EL6907, which is located approximately 130km south of Cobar. On 2 April 2024, CMPL entered into an agreement with AuriCula to acquire the 10% beneficial interests in this tenure (EL6223 and EL6907) that it did not already hold.

The agreement provided that, subject to satisfaction of customary condition precedent, CMPL was to pay A$200,000 to acquire the 10% joint venture interests that AuriCula holds in the Shuttleton and Mt Hope Exploration Licence tenements. Completion of this tenure acquisition occurred on 15 July 2024 (subsequent to the end of Q2 2024). The Shuttleton Joint Venture agreement and Mt Hope Joint Venture agreement terminated on transfer of the applicable tenure to CMPL. Following completion of this arrangement, CMPL now holds 100% legal and beneficial title to all its mining and exploration tenure (noting that some tenure remains subject to pre-existing royalty arrangements).

Exploration

During the quarter, US$2.1 million was invested in exploration.

During the quarter, MAC continued the resource development and exploration diamond drilling surrounding the upper Lead-Zinc (“Pb-Zn”) mineralisation of the Eastern and Western Systems, for a total of 1,665m. We are awaiting results and anticipate releasing them shortly but confirmed the presence of in situ, high-grade Pb-Zn material in the upper portions of the mine, within less than 40m of existing development.

Late in the quarter, extensional and infill diamond drilling also recommenced at the shallow, high-grade QTSSU-A resource and ongoing at quarter-end, with results expected to be released when data is finalised.

Exploratory diamond drilling also continued on CML5 for a total of 1,779m during the quarter. The initial drilling has intersected areas of structural complexity and base-metal geochemical anomalism indicating the potential for buried base-metal mineralisation. Preliminary interpretation of the 2024 fixed-loop electromagnetic geophysical survey data shows late-time anomalies, suggestive of deeply buried conductive material, in proximity to and along trend of the drilling at the Cherry prospect.

Warrant redemption

On 6 May 2024, MAC announced that it would redeem all public and private placement warrants that remained outstanding at 5:00 p.m. New York City time on 5 June 2024 for a redemption price of US$0.10 per Warrant and issue ordinary shares of the Company having par value of US$0.0001 per share there against.

1,026 Warrants were exercised at an exercise price of $11.50 per Ordinary Share and 15,344,751 Warrants were exercised on a “cashless basis,” resulting in the exercise of approximately 99.82% of the outstanding Warrants (of which approximately 0.01% were exercised for cash and 99.81% were exercised on a “cashless basis”) and in the issuance of an aggregate of 4,701,071 Ordinary Shares. The remaining 27,753 Warrants remained unexercised on the Redemption Date and were redeemed by the Company for cash. Accordingly, the Company will have 74,055,263 Ordinary Shares and no public warrants or private placement warrants outstanding as a result of the redemption of the Warrants. The Company continues to have 3,187,500 financing warrants outstanding to purchase Ordinary Shares, which were issued to Sprott Private Resource Lending II (Collector-2), LP in connection with a mezzanine loan note facility entered into on 10 March 2023.

Three Year Production Guidance

The copper production guidance provided to the market covering 2024, 2025 and 2026 remains unchanged:

Table 3 – CSA Copper Mine Production Guidance

Year

2024

2025

2026

 

Low

High

Low

High

Low

High

Copper Production (t)

38,000

43,000

43,000

48,000

48,000

53,000

This 3-year production guidance is based primarily on Ore Reserves but also on measured and indicated Mineral Resources (as at 31 August 2023) and, given that all the deposits are open and a large drill program is underway, we consider it likely that there will be changes over the relevant period as the Company’s overall plan to continue operational and production improvement continues to develop.

Changes to Board of Directors

Appointment of Ms Leanne Heywood

As announced on the 1 May 2024, Ms Leanne Heywood has been appointed as a Non-Executive Director of the Company’s Board of Directors, effective 1 May 2024. Ms Heywood is an experienced non-executive director with broad general management experience gained through an international career in the mining sector, including 10 years with the Rio Tinto Copper Group.

Appointment of Ms Anne Templeman-Jones

As announced on 22 July 2024, Ms Templeman-Jones has been appointed as a Non-Executive Director of the Company’s Board of Directors, effective 22 July 2024. Ms Templeman-Jones, is an accomplished listed company director with substantial financial, operational risk, regulatory, governance and strategy experience from a number of industries, including banking and finance, engineering services in the energy sector, consumer goods and manufacturing.

In addition to Metals Acquisition Limited, Ms Templeman-Jones currently serves as a Non-Executive Director, and has been responsible for a diverse range of committee chairs and memberships for Commonwealth Bank of Australia (Director since March 2018) and Trifork Ag (Director since April 2021). From November 2017 until 1 July 2024, Ms Templeman-Jones was a director of Worley Limited.

Change of Glencore Nominee Director

Also announced on 22 July 2024, are changes to the Glencore Nominee Director where Mr Mohit Rungta will replace Mr Matt Rowlinson and Mr John Burton as Glencore’s nominee Director to the Company’s Board of Directors. Glencore is entitled to nominate one Director for every 10% it holds in the Company. Following completion of the Company’s ASX listing and recent warrant redemption Glencore now has a 13.5% interest (entitling it to one nominee).

Hedging

Revenue significantly leveraged to spot copper prices with over ~70% of forecast remaining copper sales for 2024 unhedged16.

During the quarter, the Company delivered 3,105 tonnes of copper into the hedge book at an average price of US$3.72/lb. At the end of June 2024, the remaining copper hedge book consisted of the following:

Table 4 – Hedge position

 

Copper

 

2024

2025

2026

Total

Future Sales (t)

6,210

12,420

5,175

23,805

Future Sales ($/t)

3.72

3.72

3.72

3.72

Conference Call

The Company will host a conference call and webcast to discuss the Company’s second quarter 2024 results on Monday, July 22, 2024 at 7:00 pm (New York time) / Tuesday, July 23, 2024 at 9:00 am (Sydney time).

Details for the conference call and webcast are included below.

Webcast

Participants can access the webcast at the following link https://event.choruscall.com/mediaframe/webcast.html?webcastid=Odl1UuhQ.

Conference Call

Participants can dial into the live call by dialing one of the numbers below and request the operator connect to the Metals Acquisition Limited call.

Toll Free Dial In:

 

 

+1-844-763-8274

International Dial In:

 

 

+1-647-484-8814

Australia:

 

 

+61-3-8592-6289

Replay

The conference call will be available for playback until October 20, 2024, and can be accessed by dialing:

US Toll Free:

 

+1-877-344-7529

International Toll Free:

 

+1-412-317-0088

-ENDS-

This report is authorised for release by the Board of Directors.

About Metals Acquisition Limited

Metals Acquisition Limited (NYSE: MTAL; ASX: MAC) is a company focused on operating and acquiring metals and mining businesses in high quality, stable jurisdictions that are critical in the electrification and decarbonization of the global economy.

Estimates of Mineral Resources and Ore Reserves and Production Target

This release contains estimates of Ore Reserves and Mineral Resources as well as a Production Target. The Ore Reserves, Mineral Resources and Production Target are reported in MAC’s ASX Announcement dated 23 April 2024 titled ‘Updated Resource and Reserve Statement and Production Guidance’ (the R&R Announcement). The Company is not aware of any new information or data that materially affects the information included in the R&R Announcement, and that all material assumptions and technical parameters underpinning the estimates or Ore Reserves and Mineral Resources in the R&R Announcement continue to apply and have not materially changed.

Contacts

Mick McMullen

Chief Executive Officer

Metals Acquisition Limited

[email protected]

Morne Engelbrecht

Chief Financial Officer

Metals Acquisition Limited